Comment Re:Gas turbines (Score 2) 53
We have a similar situation. A very old power plant that was supposed to be downsized as a secondary baseload source is now running at capacity again, because of the power requirements from a new DC. They closed the local coal mine some time ago, so they need to ship in coal. They are working on refurbishing more of the generating units to ramp up the extra power required, as the DC brings compute power online.