Comment Re:Cool tech, but... (Score 1) 30
Yeah, I agree - it's not quite done yet. Two suggestions to 'finish' it:
1) Create a scaffolding of plumbing and electrical on site. Should be fairly prefab, and easy to assemble. Stand that all up, and the B3P (Big 3D Printer) creates the shell around it. Now you are 90%+ of the way there.
2) Have it print the shell, but with large channels where you need them in the inside surfaces and floors / ceilings. Put in all your plumbing and electrical into the channels, cover them over with the interior walls/floors/ceilings.
I would say #2 is preferable - even if the house burns down (to the concrete shell), or you want to gut it and start over, you can with all new plumbing and electrical.