Comment Re:Except nobodies doing that (Score 1) 323
Cost of nuclear station subsidy £96-£97 per megawatt hour
http://www.independent.co.uk/n...
Cost of wind
£100 per megawatt hour
http://www.telegraph.co.uk/ear...
Cost wise they are about the same.
Currently in countries such as South Korea and China, typical construction times range from 4 to 6 years
https://www.oecd-nea.org/press...
Construction time is usually very short – a 10 MW wind farm can easily be built in two months. A larger 50 MW wind farm can be built in six months.
http://www.ewea.org/wind-energ...
Add in the time for planing etc and wind is faster.