Comment Re: Can you believe this? (Score 1) 22

"Datacenter Engineers a aware of ongoing stability issues with power at our Portland 2 facility. Engineers are fully engaged and have vendors on-site working on the facility power. Here is a current status: - This facility has 2 power feeds. One is currently running on utility power and the other on generator. Both feeds are stable and there is fuel on-site to run for at least 24 hours. - All cooling at the facility is operating as designed with no known issue. - The facility has 32 UPS modules in a redundant configuration. A small subset are in a degraded state and unable to protect load. While this is a small subset of UPS modules, they are distributed through the line-up and pose a stability risk until they return to healthy state." Improbable is not impossible.