Want to read Slashdot from your mobile device? Point it at m.slashdot.org and keep reading!

 



Forgot your password?
typodupeerror
SuSE

Journal Journal: romeo and juliet 3 1

romeo and juliet 3: black angel rising
a three act play by jimmy o'leary
authorized by the estate of william shakespeare

Star Wars Prequels

Journal Journal: romeo and juliet 2

romeo and juliet 2: juliet lives
a three act play by jimmy o'leary
authorized by the estate of william shakespeare

act 1, verona, italy, the date is september 11 2001, it is an unusually hot day and the italians are out on the street milling about and buying shit from street vendors and whatever the fuck it is that italians do all day i've never been able to figure it out myself, a shopkeeper comes out and yells to the crowd out on the street

Comment If you're not hosting (Score 0, Offtopic) 333

With LRSE, you could have a decent host.

Tell 'em qpt sent you, though, and you'll get the first six months at half off the introductory business-class rate for first-time dedicated leasers, not including set up and take down fees or configuration surcharges and local infrastructure levies.

Think about e-commerce, too.

User Journal

Journal Journal: Maricopa TI on I-10 Destroyed

Over the weekend, ADOT destroyed the old Maricopa TI on I-10.

The Maricopa TI is just 1.5 miles south of Loop 202 (San Tan) and I-10.

The new interchange is not a cloverleaf, but rather a standard interchange. Maricopa Rd is being realigned as well and is a lot more straighter. This is to aid access to a Casino.

I-10 is also being widened from AZL-202 near limits to SR-347. It will be widened to 6 lanes.

User Journal

Journal Journal: Interstate 10 Widening; Arizona Loop 101 Lane Additions

The Interstate 10 Marana widening (Marana Rd - Cortaro Rd, about 10 miles) will be placed for bids in the middle of May. The project is expected to take from 16- to 18- months and is budgeted for $21,000,000.

The Arizona Loop 101 auxiliary lanes near the Loop 202 is expected to have a 90 day turn around. There have been 15 working days already. It is graded and based in some places. I expect it to be done by the end of Feb.

User Journal

Journal Journal: STATE ROUTE 51 CONSTRUCTION UPDATE

Just an update on how the construction for State Route 51 is coming along.

The project is a 75-million dollar HOV widening from Interstate 10 to Shea Blvd, a distance of about 10 miles, within a very cramped ROW, as well as direct HOV ramps from Interstate 10 to SR-51 and vice-versa. There is also minor right lane widening on Interstate 10. Minor ROW had to be bought from the city of Phoenix.