PriMus Description
The 5D BIM model can be created by associating costs with the geometric dimensions of the 3D model. This is a great advantage, because it is much faster to determine project costs. 5D BIM makes it easier and quicker to detect any changes in costs when design changes are required. Moreover, 5D BIM allows you to easily show the costs of each element on the 3D model, thanks to dynamic cost estimate updates for each project variation. The BIM model provides detailed information that identifies and quantifies elements. The main difference between the traditional and 5D BIM models is the speed at which the project cost can be changed and updated.