Best Earned Value Management Software in Brazil

Find and compare the best Earned Value Management software in Brazil in 2025

Use the comparison tool below to compare the top Earned Value Management software in Brazil on the market. You can filter results by user reviews, pricing, features, platform, region, support options, integrations, and more.

  • 1
    PMWeb Reviews
    PMWeb is an easy-to-use, web-based, capital construction project management software solution built for owners worldwide, used by Harvard, Atlanta Airport, United Nations, and more. The software is built to work with Microsoft .NET technology, and can be accessed on any device with a browser. This access can help with construction contractors to stay Manage the entire project lifecycle within one single sign-on system, replacing over 25 solutions, and built on a powerful visual workflow platform for managing all portfolio, program, and project information. One of the biggest advantages that PMWeb has over its competition is in its integration. The software has several features all integrated into one singe software interface. The interface is easy to understand, making it easier to follow and manage programs and the data involved in the business. PMWeb also features one of the most user-friendly interfaces in project management with drag and drop functionality throughout. This is one of the reasons why it is among the easiest software solutions to learn and implement. Additionally, PMWeb has multi-currency capabilities, 5+ year planning, and more, making it the number one choice for international organizations.
  • 2
    ProjectManager Reviews
    Top Pick
    ProjectManager is an award-winning SaaS company that is transforming how businesses get work done in this hybrid world. Our SaaS project and work management solutions enable world-class collaboration for thousands of customers globally, with tools for project planning, workflow management, resource management and time tracking across the entire work lifecycle. ProjectManager is simple enough for anyone to use, yet powerful enough for managers to make data-driven decisions and for businesses to manage projects of all levels of complexity. Organizations such as Nestle, Avis and Lubrizol rely on our software to manage their teams, their projects, and do amazing things together. ProjectManager is headquartered in Austin, with offices in Auckland, Seattle, and other great cities around the globe.
  • 3
    Microsoft Project Reviews
    Top Pick
    Introducing the reimagined Project, designed to be straightforward yet effective for everyone. Stay organized, focused, and in control as you tackle a range of tasks from minor assignments to major undertakings. Regardless of whether you hold the title of project manager, this intuitive app enables you to take charge of any project seamlessly. With a robust project management tool at your fingertips, initiating and overseeing projects becomes not only simpler but also more manageable. Even the most intricate projects become less daunting when you can select methods and resources tailored to your preferences. By utilizing Project alongside Teams, you can enhance collaboration and project management, facilitating file sharing, conversations, meetings, and much more. Work together on projects effortlessly, no matter the distance that separates you. Allow every team member to make real-time updates to tasks, ensuring that your group can achieve more collectively. The potential for collaboration is expanded, making it easier than ever to meet your goals.
  • 4
    Oracle Primavera Reviews
    Oversee projects of various scales with Primavera P6 EPPM, a powerful and user-friendly tool designed for the effective prioritization, planning, management, and execution of projects, programs, and portfolios on a global scale. This comprehensive solution provides insights into both current and anticipated resource utilization, facilitating precise forecasting and informed decision-making. Users can address overallocation issues by redistributing resources or adjusting assignments as needed. Additionally, it supports the planning, scheduling, and control of extensive programs alongside individual projects. With features focused on optimizing roles and resources, as well as managing demand and capacity, it ensures streamlined communication regarding resource needs and decisions throughout the project's duration. Furthermore, the software offers graphical representations for analyzing resource and role utilization, enhancing clarity and strategic planning. This makes it an indispensable asset for project managers striving for efficiency and effectiveness in their operations.
  • 5
    Tempo Budgets Reviews

    Tempo Budgets

    Tempo

    $4000 per year
    Tempo Budgets is a financial portfolio and project management tool for SME's as well as large-scale enterprises that implement agile or traditional methodologies. You can see all your portfolios and projects in one powerful overview. Manage them in an agile way. Only Jira app that supports Earned Valu Management In real-time, manage project scope, schedule, and costs. Roll-up data at the portfolio level Tempo is free to try and you'll see why more customers than 20,000, including 120 of The Global 500, use it. Highlights - Real-time visualization of portfolio and project health, including revenue and cost overviews Earned Value Management (EVM), or traditional reporting - Budget baseline labelling, versioning - Forecasts and financials vs. projected - Manage staff allocation, capacity, and workload - Manage wages and overtime pay Enterprise features (data visibility control and Jira Data Center compatible API) Integration of Tempo Timesheets
  • 6
    Earned Value Reviews

    Earned Value

    Earned Value

    $9 per month
    Monitor earned value metrics in real-time across various projects and portfolios while seamlessly integrating with your project management and time-tracking tools. Earned Value Management (EVM) has established itself as the benchmark in project cost management. We have streamlined the EVM process into a user-friendly three-step approach, making it accessible for beginners and small enterprises alike. Our application stands out from conventional systems due to its simplicity, lightweight design, and user-friendliness. It operates independently, equipped with all necessary functionalities, while also offering the option to connect with any project management and time-tracking software through a REST API. For those with a business subscription, we will facilitate the integration process at no extra cost. Designed with small businesses in mind, our solution employs an industry-standard methodology that not only predicts cost overruns at project completion based on current trends but also provides a dollar amount reflecting progress according to completed tasks. Our app automatically generates detailed Earned Value Management (EVM) metrics, allowing you to track your time and expenses efficiently or integrate with existing time-tracking applications, ensuring you have all the insights needed for successful project delivery. This holistic approach empowers businesses to maintain control and make informed decisions throughout their project lifecycles.
  • 7
    TALAIA OpenPPM Reviews

    TALAIA OpenPPM

    SM2 Software & Technology

    $1 one-time payment
    When each project manager employs their own methods and tools, it leads to fragmented information that complicates the ability to maintain a comprehensive view of the project portfolio. By consolidating information through Talaia and adhering to best practice standards, you can access critical insights necessary for effective project portfolio management. Ditch the cumbersome spreadsheets and intricate reports; Talaia also serves as a valuable partner in your digital transformation journey, aiding in the management and oversight of the entire process. Unify all project information within a single platform, organizing it according to PMBOK guidelines. Eliminate the inefficiencies of waiting for reports or updates, and proactively monitor the status of your projects and programs. Gain control over costs, timelines, risks, incidents, and delays, thereby enhancing your forecasting and decision-making capabilities. Streamline your project planning efforts and take a proactive stance on managing changes in budget, resources, and timelines for optimal results. By leveraging Talaia, you can significantly enhance collaboration and communication across all projects, leading to more successful outcomes.
  • 8
    forProject Reviews
    forProject technology offers top-tier software solutions and support services designed to streamline and enhance your earned value management (EVM) processes. Our goal is to help you conserve both time and effort, allowing you and your team to concentrate on the most critical tasks while improving overall visibility. The user interface features intuitive menus, tools, and icons that effectively assist users in navigating the EVMS workflow. Whether you are managing a government contract with a strict EVMS requirement or merely seeking to establish basic EVM practices to boost internal management transparency, EVMS forProject can adapt to meet your specific requirements. With direct integration, your team can minimize concerns regarding accurate cost-schedule alignment, freeing up more time for proactive project management. The solution also includes a customizable Excel import and export feature that facilitates easier financial data integration and migration of legacy EVMS data. Furthermore, forProject can be tailored to align with your unique business rules and standards, ensuring it meets your organizational needs precisely. This level of customization empowers businesses to implement EVM strategies effectively and efficiently.
  • 9
    QuantumPM Earned Value Manager Reviews

    QuantumPM Earned Value Manager

    QuantumPM

    $799 one-time payment
    QuantumPM Earned Value Manager harnesses the scheduling capabilities of Microsoft Project to refresh the actual work completed on a project, allowing for smooth integration into reporting processes. You can monitor your real progress against work packages while automatically generating all standard earned value metrics. This tool merges earned value management best practices with scheduling and fundamental reporting features. It boasts a user-friendly graphical interface and a report wizard that guides you in crafting a robust plan and assessing actual progress relative to that plan. By automatically handling all EVM calculations, it frees you up to focus on analysis and management tasks instead of getting bogged down in mathematics. Additionally, it enforces change control and other EVM best practices, simplifying the documentation process to demonstrate compliance for your project. You can also import actual costs from your financial system, along with actual effort or percentage complete data directly from Microsoft Project, streamlining your project management efforts even further. Ultimately, this tool enhances the efficiency and accuracy of project tracking and reporting, making it a vital asset for project managers.
  • 10
    4castplus Reviews
    Oversee all your projects and programs using a centralized, cohesive software platform. Effective information management and the right resources are essential for the success and profitability of your projects. It’s time to advance and liberate yourself from the limitations of spreadsheets and disparate systems. 4castplus offers a robust set of integrated tools designed for project cost management, making it easier to plan and execute construction endeavors. Manage your project budgets and timelines with a streamlined and efficient team to enhance productivity across your entire project portfolio. With the ability to access crucial metrics anytime and anywhere, you can achieve complete visibility into your projects through a single, centralized solution. Featuring cohesive and intelligent tools and workflows, 4castplus serves as the ideal technology for construction contractors aiming to achieve more and deliver outstanding results. Our distinctive array of cloud-based solutions empowers organizations to navigate their projects with both insight and assurance, ensuring they remain competitive in a rapidly evolving market.
  • 11
    Contruent Reviews

    Contruent

    Contruent (Formerly ARES PRISM)

    Software for managing capital projects that delivers value faster. Time is crucial for major construction projects. Delays can have serious consequences. Each month that a project takes longer to start, and each month that is added to the schedule, increases risk and costs. Contruent capital project management software makes it possible to get your projects moving faster. Contruent software is ready for project right out of the box. It has more than 25 years worth of best practices and extensive capital construction experience built right into it. EPCs and owners/operators will find everything they need to ensure project success so they can meet their deadlines and budget expectations. Contruent capital project management software has helped build many of the largest construction and engineering projects across a range of industries--including mining, oil and gas, rail, infrastructure, utilities and more--on six continents.
  • 12
    Oracle Primavera Unifier Reviews
    Implementing best practices can enhance both visibility and efficiency in operations. Utilize a high degree of configurability along with ready-made processes to quickly automate any business function using tailored forms and workflows. In today's landscape, capital program management has emerged as a vital strategic focus. By digitizing and automating your capital asset planning and execution workflows, you can utilize a single, cost-effective system to oversee aspects such as cost, schedule, scope, and quality. By effectively prioritizing projects, you can enhance the value of your capital investments while ensuring ongoing visibility into project timelines, managing expenses, and facilitating collaboration across your asset portfolio. Streamline and automate the tracking and management of budgets, commitments, expenditures, forecasts, and business processes both within your organization and throughout the supply chain. Additionally, create diverse capital planning scenarios that encompass both top-down and bottom-up cash flow models, allowing for well-informed portfolio approvals for execution. This comprehensive approach not only fosters improved decision-making but also strengthens overall project execution.
  • 13
    xpdProject Reviews
    xpdProject from xpdIentinc offers a centralized platform for managing project resources, statistics, and deliverables seamlessly. Picture integrating every aspect of a project into a single, user-friendly, and secure online interface that encompasses planning systems, contracting, and billing solutions. This tool provides you with genuine control over task dependencies, user workloads, and account management, all while allowing you to work effortlessly from any location at any time. For project managers, Earned Value Management (EVM) is essential, and with xpdProject, you can easily conduct a side-by-side comparison of actual versus anticipated goals regarding expenses and completion percentages. Additionally, xpdProject functions as collaboration software designed to consolidate site-wide information and data, enhancing project management through effective scheduling, issue resolution, quality assurance, and professional services automation. This comprehensive approach not only streamlines project oversight but also fosters improved communication among all team members.
  • 14
    Deltek Open Plan Reviews
    Open Plan, a vital component of our PPM suite, boasts sophisticated project scheduling capabilities that encompass multi-project analysis, critical path planning, resource management, and risk assessment, all designed to enhance the quality of plans and schedules. Its advanced functionalities help pinpoint quality concerns while ensuring adherence to both industry and corporate standards and best practices. Users can effortlessly create, manage, validate, and sustain project plans and schedules, while also capturing progress and updating forecasts with ease. By utilizing robust controls, teams can validate logic, assess quality, and align with industry best practices, organizational policies, and federal regulations. Efficiently review, allocate, and manage resources and budgets to optimize performance and reduce risks effectively. The tool streamlines planning through quick data input, thorough analysis, and comprehensive reporting on project statuses and forecasts. Moreover, automated quality checks and logic evaluations offer immediate feedback during the scheduling process, enhancing overall efficiency. By employing both industry-standard guidelines and customizable validation rules, Open Plan ensures compliance and facilitates smooth project execution. Ultimately, this powerful tool not only maximizes project outcomes but also fosters a culture of continuous improvement within organizations.
  • 15
    Deltek Acumen Reviews
    The Acumen Suite streamlines the processes of analyzing project schedules, managing risks, and optimizing timelines, empowering your team to make informed decisions and enhance project outcomes. At the core of this suite is Acumen Fuse, which quickly assesses plans to guarantee dependable project schedules within minutes. By incorporating Acumen Risk and 360, users can overcome the typical hurdles of statistical and logical risk models while effortlessly generating schedule scenarios that facilitate effective acceleration of projects. Furthermore, the addition of Acumen Touchstone automates the processes of schedule submissions, evaluations, and feedback, leading to improved quality and significant time savings. Acumen Fuse not only aids in scrutinizing project schedules but also analyzes cost data, ensuring the creation of the most precise schedules and cost estimates achievable. Acumen Risk, through its comprehensive modeling, analysis, and reporting functionalities, is designed to minimize risks, lessen their impacts, and enhance the decision-making process, thus contributing to overall project success. Together, these tools create a robust framework that significantly increases efficiency and effectiveness in project management.
  • 16
    Deltek Cobra Reviews
    Analyzing the health of a project and predicting its future outcomes can be quite challenging without the appropriate tools. By utilizing Cobra’s top-tier earned value management features, you can seamlessly integrate both cost and schedule components, establish effective cost controls, and accurately measure performance to forecast results that enhance project success. With precise and compliant EVM reporting throughout all stages of the program, your team is empowered to focus more on proactively managing costs and resources rather than getting bogged down in administrative tasks. This approach provides unparalleled insights into project performance, enabling you to harness data effectively to enhance communication with customers and improve reporting accuracy. By maintaining strict oversight of project costs and resources, you can ensure better project outcomes and increased profitability. Additionally, with unlimited rate scenarios and top-down planning, you can perform what-if analyses that effectively model the impacts of various cost factors. Ultimately, this strategic framework not only supports ongoing project management but also paves the way for future projects to thrive.
  • 17
    Deltek wInsight Reviews
    Possessing the appropriate tools for analyzing project data and forecasting future outcomes is essential for attaining project success and fulfilling client expectations. wInsight’s earned value management (EVM) features provide comprehensive access to dynamic analyses and reporting for both projects and portfolios, while facilitating data exchange in necessary formats. Its customizable dashboards allow for the precise presentation of reports to stakeholders, empowering them to manage project expenses proactively and anticipate results. By utilizing robust EVM analytics, teams can assess performance, uncover trends, and confirm the validity of their forecasts. Additionally, users can swiftly pinpoint data irregularities and challenges, enabling them to delve into specific issues for actionable insights. It is also crucial to centralize cost performance information and effectively measure and report earned value metrics throughout every phase of the program. This approach not only enhances transparency but also fosters improved decision-making and project monitoring.
  • 18
    Safran Risk Reviews
    Safran Risk integrates comprehensive schedule and cost risk analysis, enabling you to explore alternative delivery methods and make informed choices to achieve project success. Relying on outdated tools may leave you with limited capabilities, lack of valuable integrations, and an inability to conduct real-time modeling and analysis swiftly. However, with Safran Risk, you gain the power to overcome these challenges. Are you truly aware of how uncertainties and risks can affect your projects? Safran Risk transforms your risk data into actionable time and cost insights, helping all stakeholders grasp the significance of each risk's impact. Seamlessly merge advanced project schedule risk and cost risk analysis for enhanced understanding and smarter, immediate decision-making. By utilizing Safran Risk, you can significantly improve your ability to comprehend, manage, and mitigate risks, ultimately leading to superior project outcomes. With better risk management, your projects can achieve both efficiency and effectiveness in execution.
  • 19
    Artemis Views Reviews
    Artemis Views offers improved project management functionalities via a cohesive product suite that streamlines operations. This platform assists organizations in consolidating projects, expenses, and resources into a user-friendly, modern interface. With Views, users can effectively oversee large-scale projects, quickly process project plans, and perform complex calculations, yielding results in mere seconds rather than hours. Achieving comprehensive cost transparency within a project timeline minimizes the frequency of cost-related adjustments. The inclusion of advanced business intelligence tools, comprehensive reports, dashboards, and interactive analytics aids in making informed budgetary revisions. Views also enhances business processes through workflow-based, end-to-end baseline change management, which includes documentation for work authorization. The capability to define custom business rules ensures process compliance and maintains data integrity and synchronization. Organizations can upgrade their current solutions, eliminate expensive standalone products, or explore new options without any financial risk. In essence, Artemis Views empowers organizations to optimize their project management efforts while ensuring high-quality outcomes.
  • 20
    Empower Reviews

    Empower

    Encore Analytics

    Empower stands out as the pioneering browser-based analytical tool that seamlessly combines earned value, scheduling, work authorization, and essential performance metrics to facilitate proactive management of intricate projects. With its visually appealing and robust user interface, Empower delivers instant productivity enhancements for control account managers, program managers, support teams, and oversight bodies alike. This innovative tool is meticulously crafted to swiftly pinpoint areas of concern, uncover trends, present detailed cost elements, visually represent schedule Gantt charts, promptly address data quality challenges, back data-driven audit processes, and simplify the generation of narrative analyses through an integrated workflow system. Moreover, its browser-based framework ensures a reduced total cost of ownership compared to traditional desktop applications, as it eliminates the need for installation on individual machines. Updates are efficiently managed on a centralized server, ensuring streamlined user maintenance and greater efficiency across the board. By prioritizing usability and accessibility, Empower significantly enhances project management capabilities for diverse teams.
  • 21
    MEGOWORK PPM Reviews
    When goals are poorly defined and projects are initiated without alignment to the company's strategic direction, it often leads to ineffective execution and inflated financial outcomes. Additionally, the scarcity of accessible data and the absence of clarity surrounding ongoing projects engender confusion among team members. This lack of transparency poses a significant risk to the overall project roadmap, undermining its success. Establishing a clear and effective project governance framework can be quite challenging, often requiring substantial time investment to create a standardized and repeatable process. Inaccurate reports generated manually, paired with unclear project insights, hinder portfolio managers' abilities to prioritize and optimize projects effectively. Relying on manual labor and processes not only produces conflicting and unreliable data but also results in wasted resources, time, and effort. The resulting confusion and lack of insight contribute to poor resource management, which further exacerbates bottlenecks and delays in project timelines. Ultimately, organizations must prioritize enhancing visibility and clarity to streamline their project execution and improve overall efficiency.
  • 22
    WebEVM Reviews
    WebEVM efficiently processes accounting and project management data, whether for a single project or numerous projects spanning a decade, in mere minutes instead of the traditional hours or days. This allows users to minimize the time spent on data collection and turbulence, enabling them to focus on analyzing information across a broader array of projects, which can be planned and scheduled for extensive periods. EVM practitioners can now easily handle a steady influx of data from various sources, streamlining their workflow. With a dedicated focus on real-world challenges and business processes, WebEVM leverages innovative technology to enhance the entire earned value lifecycle management. Developed by experts in the field, it caters specifically to the needs of EVM professionals. Furthermore, WebEVM serves as a business-to-business integration of earned value, effectively connecting all stakeholders involved in project management, including consultants, partners, suppliers, customers, and team members, ensuring seamless collaboration throughout the project lifecycle. This holistic approach fosters a comprehensive understanding of project performance and encourages proactive decision-making.
  • 23
    Deltek PPM Reviews
    Achieve exceptional project outcomes with top-tier solutions for performance management, workflow, scheduling, and risk management. Deltek offers industry-leading Project Portfolio Management (PPM) tools that feature powerful earned value management, customizable workflows, scalable scheduling options, and detailed risk analysis, all designed to enhance project success rates for clients. With Deltek’s PPM software, you can make well-informed decisions supported by real-time metrics, comprehensive project performance analytics, and thorough risk reporting. Thousands of clients around the globe rely on Deltek to maximize their performance and profitability, ensuring they stay ahead in competitive markets. Effectively manage costs, implement compliance measures, evaluate earned value, forecast performance, and achieve your project goals with confidence. By analyzing schedule and cost data, managing risks, and accelerating timelines, you can ensure successful project delivery. Leverage workflows to streamline project management, including scheduling, cost oversight, change control, reporting, and analytical processes to drive efficiency and effectiveness in your operations. Embrace these solutions to continuously elevate your project management capabilities and achieve remarkable results.
  • 24
    EcoSys Reviews
    There is a strong argument for moving away from traditional methods and embracing an Enterprise Project Performance strategy. By unifying project portfolio management, controls, and management into a cohesive enterprise solution, EcoSys provides rapid access to more precise insights. This leads to enhanced project outcomes. Bid farewell to fragmented data and the cumbersome, unreliable nature of spreadsheets. With EcoSys, informed decision-making is facilitated through automated reporting and instantaneous data availability. Achieving equilibrium between resource capacity and project requirements can be effortless. Remove uncertainty and maximize your portfolios through a strategic alignment of goals and project execution. This integrated approach not only streamlines processes but also fosters a culture of continuous improvement within organizations.
  • 25
    CloudEVM Reviews
    Whether dealing with a single project's accounting and project management data spanning a year or even a decade, or managing multiple projects throughout an organization, CloudEVM completes project analysis in mere minutes instead of hours or days. This allows users to invest less time in data collection and turbulence, facilitating deeper analysis across a wider range of projects that can be scheduled for months, years, or even decades. EVM professionals can now effortlessly manage a steady influx of data from various sources with CloudEVM. This platform presents a highly specialized earned value management solution that effectively tackles real-world challenges and enhances business processes, utilizing technology to optimize the entire earned value lifecycle. Crafted by EVM experts for those in the field, CloudEVM's browser-based interface promotes seamless collaboration among employees, clients, and contractors alike. Such enterprise-level collaboration provides organizations with substantial advantages, helping them to streamline operations and improve efficiency. With CloudEVM, the future of project management looks brighter and more efficient than ever before.