Journal Journal: Fritos
-Adam
We passed both the electrical and mechanical (heating) inspections, and now have the drywall on the ceilings and some walls.
It is hoped that we'll have it taped and mudded this weekend, and painted this next week.
Looks like nearly all beta testers will be getting winxp, up to five licenses. Apparently there was a lot of concern over who was considered an "active" tester or not, so they opened it to a wider range of testers. Which means I'm getting it.. ! Yay!!
-Adam
Just got the message in the beta newsgroups - just before 3pm MS put build 2600, the RTM version, of WinXP on the beta download server. Second later it was rejecting connections... Sadly I didn't make it yet. I should have it tonight, though... It's a time limited version, and I hope that they send out full versions to testers, but if not you know this is going to be on my christmas wishlist (about the time it'll expire...
-Adam
Exterior studs
before moving onto the next 3 phases, which I hope to complete before school starts after labor day.
Interior studs and doors
Wiring (electrical, 2 cat5, cable)
Drywall and finishing
I'd like to do a ceiling as well, but the wife is hesitant, having had a bad experience with drywalling above her head...
-Adam
Note to self: knee pads. Please. I'm begging you.
The hardest part of climbing the ladder of success is getting through the crowd at the bottom.