Comment Industrial Development (Score 1) 1127
I did a control system for a covered skid that contained three natural gas compressors. They had to pump it up to 3600 psi (245 atmospheres). It was for fueling vehicles. The pressure had to be that high so that the tank would equalize to a reasonable pressure / gas content in under 10 minutes.
It was 40 degrees F in the winter and 95 degrees F in the summer. Took about 6 months so I got to feel both. It also reeked of natural gas, was greasy, oily, etc. There were metal shavings and fumes from all of the machining and welding.
I also worked a similar gig off and on for about two years involving a circuit-board drilling operation. Imagine walking through a factory floor with acid baths and various machinery to work on scoring machines and massive computer-controlled drills. The drills were pretty serious (60krpm) and they each had a 1.5 ton block of granite just to dampen vibration. To this day, it's the only computerized machine I've worked on that required a pneumatic hook-up.
Here's a photo of the drills from the internet: http://www.cerambus.com/equip/images/4-MK%205%20DR.JPG