Business Software for Oracle Primavera

Top Software that integrates with Oracle Primavera

  • 1
    Kinderpedia Reviews

    Kinderpedia

    Kinderpedia

    $65/center/month
    4.8 out of 5 stars
    322 Ratings for Kinderpedia
    See Software for Kinderpedia
    Learn More for Kinderpedia
    KINDERPEDIA is an AI-powered, cloud-based school management and communication platform for K-12 schools and childcare centres. Trusted by 2,000+ institutions in 40+ countries, it helps leaders, teachers and admin teams simplify operations, reduce repetitive work, strengthen family engagement and create a connected educational experience. The platform brings academic, administrative, financial and communication workflows into one secure ecosystem. Schools can manage student and family records, attendance, timetables, classroom activities, gradebook, assignments, progress tracking, daily reports, events, admissions, tuition, invoicing, payments and reporting. Kinderpedia includes practical AI tools. They help educators and leaders communicate clearly, create content faster, streamline reporting, document progress and identify patterns. Teachers plan schedules, record attendance, manage lessons, track progress or developmental milestones, share feedback and document observations in real time. Families receive updates, photos, videos, event alerts, progress info, invoices and notifications, with multi-language tools for diverse communities. Kinderpedia’s Admissions CRM supports the journey from first enquiry to enrolment, managing leads, follow-ups, workflows and the transition into the school management system. Financial tools support tuition plans, automated invoicing, payment tracking, family balances, overdue amounts, bank statement import and reports across one or multiple locations. Payment and accounting integrations include Stripe, Paymob, InvoiceXpress, BT Pay, SAGA-compatible exports, CSV/XLS exports and PDF invoices. Dashboards, reports, multi-location management, role-based permissions and secure cloud access give leaders visibility and control as they grow
  • 2
    Visual Planning Reviews

    Visual Planning

    Stilog Inc.

    $15.00/month/user
    4.5 out of 5 stars
    120 Ratings for Visual Planning
    See Software for Visual Planning
    Learn More for Visual Planning
    Visual Planning is a powerful scheduling and resource management tool that's simple to use. Visual Planning is used by thousands of organizations to share their schedules and work more efficiently together.
  • 3
    TimeControl Reviews

    TimeControl

    HMS Software

    $2.75/user/month
    5.0 out of 5 stars
    1 Rating for TimeControl
    See Software for TimeControl
    Learn More for TimeControl
    TimeControl is a timesheet system that can be used for both finance and project management. TimeControl was designed to serve multiple purposes at once. TimeControl tracks time task-bytask and project-byproject. Despite its project-based controls it is still a financial timesheet that meets all the requirements of payroll, human resource, billing, and finance. TimeControl is available for subscription in the cloud and for purchase for an installation on-premise. It includes both a browser interface as well as the TimeControl Mobile App for iOS or Android.
  • 4
    Planview AgilePlace Reviews
    Planview AgilePlace is an enterprise-grade Kanban platform that helps organizations visualize and manage work across teams, programs, and value streams. It supports Lean and Agile delivery by making work visible from strategic planning through execution. Teams use customizable Kanban boards to plan, prioritize, and deliver work while maintaining flow. AgilePlace provides real-time insights, metrics, and AI-powered analytics to identify risks, dependencies, and bottlenecks early. Leaders gain at-a-glance visibility into progress, priorities, and outcomes across the organization. The platform integrates seamlessly with existing Agile, PPM, ITSM, and DevOps tools to unify workflows. Collaboration features keep discussions, documents, and decisions in context. With enterprise scalability and governance, AgilePlace enables faster delivery without sacrificing quality. It empowers organizations to continuously improve how work gets done.
  • 5
    PMWeb Reviews
    PMWeb is an easy-to-use, web-based, capital construction project management software solution built for owners worldwide, used by Harvard, Atlanta Airport, United Nations, and more. The software is built to work with Microsoft .NET technology, and can be accessed on any device with a browser. This access can help with construction contractors to stay Manage the entire project lifecycle within one single sign-on system, replacing over 25 solutions, and built on a powerful visual workflow platform for managing all portfolio, program, and project information. One of the biggest advantages that PMWeb has over its competition is in its integration. The software has several features all integrated into one singe software interface. The interface is easy to understand, making it easier to follow and manage programs and the data involved in the business. PMWeb also features one of the most user-friendly interfaces in project management with drag and drop functionality throughout. This is one of the reasons why it is among the easiest software solutions to learn and implement. Additionally, PMWeb has multi-currency capabilities, 5+ year planning, and more, making it the number one choice for international organizations.
  • 6
    Assai Reviews

    Assai

    Assai Software Services

    $5999/month
    5.0 out of 5 stars
    1 Rating for Assai
    Assai's Document Management system (DMS or eDMS) is designed to help you easily store, manage, and access all of your important documents and information in one central, easily searchable repository. Whether you're looking for documents, drawings, correspondence, emails, contracts, or purchase orders, our system allows you to quickly find what you need using comprehensive search options on metadata and content. One of the key benefits of our DMS is that you have complete control over access to your documents and information. This means that you can easily manage who has access to what, ensuring that your team always has the latest versions of the documents they need. In addition to providing a central repository for your documents and information, Assai's Document Control system also allows you to streamline and control workflows. With our system, you can easily set up and maintain workflows, making use of user inboxes, automatic workflow assignments, and forwarding. And with our Enterprise Content Management capabilities, we're able to support even the most complex projects and operations. Get a grip on your projects, assets, documents and data with our Common Data Environment.
  • 7
    ProPlanner Reviews

    ProPlanner

    Ipsum

    200/project/month
    5.0 out of 5 stars
    1 Rating for ProPlanner
    Lean Construction makes scheduling and planning simple, fast, collaborative, and easy.
  • 8
    Fracttal Reviews
    🥇 The ultimate all-in-one solution for maintenance management We deliver a distinctive approach to tackle your challenges by combining Fracttal One with AI, IoT, integrations, and automation, ensuring you never overspend. Turn maintenance into a strategic advantage: 🔹 Centralize data to enhance collaboration across departments and external partners. 🔹 Integrate seamlessly with existing enterprise systems: ERP, MES, BMS, SCADA, and more. 🔹 Digitize records for full traceability and transparency. 🔹 Predict and prevent failures with condition-based and predictive maintenance. 🔹 Extend asset lifespan and optimize performance. 🔹 Manage multiple sites, warehouses, and equipment from one platform. 🔹 Track KPIs and team efficiency in real time. 🔹 Automate scheduling and preventive alerts to stay ahead. ✅ Boost overall productivity and gain a competitive edge.
  • 9
    RIB Candy Reviews
    RIB Candy is the most popular construction management software suite. It's designed to estimate and control built environment projects. Candy is unique and powerful. It was designed to meet the needs of the industry, from take-off to pricing and planning a job, to controlling at the site level, to the final certificate. Project Estimating, Quantity Takeoff (QTO), Planning and Forecasting, Cash Flow, Valuations and Subcontract Management are just a few of the features.
  • 10
    NetPoint Reviews

    NetPoint

    PMA Technologies

    $3900.00/one-time
    Engage all project managers! NetPoint®, project scheduling software, transforms scheduling into an interactive planning-centric experience that encourages collaboration and communication. NetPoint's intuitive representations of activities and relationships allow all stakeholders to work together in a seamless way that creates a CPM/GPM®, logic-driven schedule using the same tool that is used for planning. NetPoint's latest version of project scheduling software has many requested features, such as a resizable timeline, savable filter options, and the ability add headers or footers. NetPoint combines the power and simplicity of the GPM algorithm with an intuitive, visually-oriented interface. NetPoint is a flexible project management software. Your team members and project managers can plan ahead and backward, create schedules faster, communicate the project timeline clearly, and empower them to do so.
  • 11
    VisiLean Reviews
    VisiLean is the heart of a company’s Project Management function. It records every action during the project for detailed review. VisiLean connects your project teams and data in real time, from design to execution. It supports informed decision-making and leads to more predictable and profitable outcomes. Get the latest information from Lean-BIM experts around the world. Visilean is currently the only service that allows the integration of collaborative planning with BIM. The Mobile App allows you to track progress on-site in a matter of minutes. You can add notes, constraints, files, and photos as you go. Automated linking to tasks seamlessly reduces non-value addition time. Visualise the progress of your project on the BIM Model. Examine your Delayed Tasks and Stopped Tasks. Also, see the Percent Planned Completion (PPC) report.
  • 12
    RiskyProject Professional Reviews
    RiskyProject is a complete suite of project risk analysis and project risk management software in one seamless package that is easy to use, integrates with Microsoft Project, Primavera, and other scheduling and planning tools, and covers the complete risk life cycle. RiskyProject includes qualitative risk analysis and risk management as well as quantitative Monte Carlo schedule and cost risk analysis. RiskyProject also includes comprehensive Risk Register. With RiskyProject, you no longer need two or more applications to perform Monte Carlo project risk analysis and manage your project risks. They are now in one easy to use and affordable desktop software. Project risk analysis is a process of defining and analyzing threats and opportunities affecting project schedules. Project risk analysis helps to determine how uncertainties in project task and resources affect project scope, deliverables, cost, duration, and other parameters. Project risk analysis also helps to ranks project tasks and resources based on their risk exposure, calculate overall project risk exposure, and determine efficiency of risk mitigation and response efforts. RiskyProject supports both quantitative and qualitative risk analysis and management. Cost and sch
  • 13
    Mastt Reviews
    Mastt is capital project and program management software powered by AI for owner-side construction teams. Built for project owners, project managers, project management consultants, government agencies, developers, PMOs, and owner’s reps, Mastt helps teams manage capital projects, programs, and portfolios in one platform. Mastt centralizes project controls across cost management, scheduling, risk registers, contracts, progress payments, change orders, dashboards, documents, and executive reporting. Teams can track budgets, commitments, actuals, forecasts, cash flow, milestones, approvals, project health, and portfolio performance without rebuilding spreadsheets. Mastt includes the core features capital project teams need: - Cost management, budget tracking, forecasting, and cash flow. - Contract administration, change orders, progress payments, and approvals. - Risk registers, ratings, impacts, treatments, and owners. - Schedule and milestone tracking for phases, dates, and progress. - Program dashboards, project roll-ups, RAG status, and reporting. - AI Chat, AI PDF Reader, invoice scanning, data extraction, and payment verification. - Document management, link sharing, permissions, audit trails, and history. Mastt AI helps teams review contracts, invoices, schedules, reports, drawings, and payment documents faster while keeping human oversight in the workflow. Users can check source material before saving outputs, which keeps records traceable and audit-ready. Mastt supports government, infrastructure, healthcare, education, aviation, defense, utilities, and real estate teams. It combines construction project management, owner-side project controls, and AI workflows to improve visibility, governance, reporting, and on-time, on-budget delivery.
  • 14
    Full Monte SRA Reviews

    Full Monte SRA

    Barbecana Inc.

    $1,195 one time payment
    Barbecana, a company based in Houston Texas, USA, produces the Full Monte Schedule Risk Analysis, (SRA), Monte Carlo Simulation software Microsoft Project and Oracle Primavera 6 This software will dramatically increase your ability to forecast realistically when you use traditional Critical Path project management methods.
  • 15
    Epicflow Reviews

    Epicflow

    Epicflow

    €22.5 per user / per month
    Epicflow is a predictive project portfolio management platform designed for complex, resource-constrained organizations. Built on over 20 years of research and capacity management expertise, it provides PMO, portfolio, operations, and finance leaders with a shared decision layer to convert finite specialist capacity into predictable delivery schedules, protected project margins, and maximum portfolio throughput. Organizations leveraging Epicflow can: - Predict and resolve bottlenecks early: Identify demand-capacity gaps across shared specialist pools weeks and months before they disrupt delivery commitments. - Sequence work by value per constrained hour: Automatically rank and stagger initiatives using the AI-powered Epicflow Portfolio Optimizer (EPO) and Return on Remaining Investment (RRI) to maximize financial return. - De-risk decisions with What-If simulations: Test alternative start dates, staffing reallocations, and priority shifts in isolated sandboxes before committing changes to live plans. - Connect schedules directly to financial outcomes: Quantify monetary drag cost, predicted contract penalties, and milestone-linked cash flow timing directly from resource-constrained delivery dates. - Deploy without operational friction: Operate as a strategic decision overlay above existing tools (Jira, Microsoft Project, Oracle Primavera P6, SAP) while preserving native team workflows and systems of record. - Accelerate delivery throughput by 20–50%: Execute significantly more projects using existing specialist capacity without increasing headcount or operational costs. By uniting operational capacity with commercial outcomes, Epicflow enables enterprise leadership to replace reactive firefighting with proactive, value-driven portfolio governance.
  • 16
    Lean Power Reviews
    Lean Power, a patented, dynamic work management and execution platform, that empowers companies to more efficiently perform routine work instructions. This saves labor, increases the accuracy of field data collection, and reduces the risk of equipment and plant failures. Lean Power digitizes PDF-based and paper-based work packages and turns them into digital instructions. Lean Power supports all aspects of dynamic procedures, including creation, planning and execution. It also records management. Lean Power can be used as a standalone work planning and execution tool or integrated with existing document and asset management systems. The application includes a backend server and a frontend web app. The application uses forms-based authentication and stores data in an encrypted state. It communicates via secure web services over a secure connection.
  • 17
    Aritic PinPoint Reviews
    To design and execute an exceptional marketing automation campaign, it is essential to focus on features that ensure a seamless customer journey, facilitate convenient lead generation, simplify lead management, and ultimately convert leads into satisfied customers. Elevate your marketing efforts and streamline repetitive tasks by mastering marketing automation with Aritic PinPoint, which is supported by our dedicated team of marketing and sales professionals available around the clock. By utilizing Aritic's marketing automation software, you can enhance your marketing strategy through the creation of distinctive automated workflows that engage users across various online platforms, transforming leads into loyal customers. With the support of bi-directional native CRM integration technology, fully leverage the capabilities of an effective marketing automation system to build relationships more swiftly with prospects, leads, and customers alike. Moreover, gain valuable insights by accessing and utilizing detailed performance data through Aritic's comprehensive marketing automation tools, allowing you to continuously refine your strategies and improve results. Investing in these tools not only enhances efficiency but also fosters a deeper understanding of your audience's behavior and preferences.
  • 18
    Aurigo Masterworks Reviews
    Aurigo Masterworks Cloud Suite is a comprehensive solution designed to manage the full lifecycle of capital programs. It supports public agencies from long-range planning through construction delivery and ongoing operations. The platform centralizes data, workflows, and stakeholders into a single system of record. AI-powered insights and real-time dashboards help teams identify risks early and take corrective action faster. Masterworks simplifies capital planning, funding approvals, and multiyear program updates using scenario modeling. Construction teams benefit from consistent processes that improve predictability and quality. Mobile access ensures field and office teams stay aligned with up-to-date information. Built-in security meets strict FedRAMP and StateRAMP standards. The suite reduces manual work while improving transparency and accountability. Aurigo Masterworks helps agencies optimize outcomes across their entire capital portfolio.
  • 19
    Mpower Reviews
    Mpower lets you view and project manage the entire picture from anywhere in the globe. Ascertra is a leader in project cost management software. They combine it with inspiring consultancy and training to offer powerful solutions for project information management and cost management. We are an international company that focuses primarily in the oil and natural gas, nuclear, and mining industries. Our products and systems can be used in all areas of engineering, construction, maintenance, and construction. Ascertra is a specialist company that provides software, training, and consultancy for project cost management. While we have grown up in the oil and gas industry, which remains our main business area, we have developed products and systems that can be easily transferred to other fields such as construction, nuclear, and mining. For hands-on experience with our software, we offer workshops that use your data.
  • 20
    ProjectVIEW ERP Reviews

    ProjectVIEW ERP

    DANAOS Projects Software Solutions

    Auto-Import BoQs from any.xls/.ifc file in tree format Connect dwgs and BoQ lines. Track BoQ/WBS versions and extract QTO. Manage Work Performance Data, site office interactions, MRFs & MRIs. dwgs, progress inventory, subcontractors labor, payroll, machinery, and RFIs. Forecasts, Control Productivity, Size Risk and Control Productivity. Use cost codes that were previously linked to BoQs or WBS to get an ominipresent performance for projects, regardless of BoQ or WBS updates. You can also manage Claims. Similar to other infrastructure and civil works projects, controlling actual vs budgeted cost motorways and railways requires lifecycle asset management and serviceability. Beyond the bid and construct phases, we facilitate Built-Operate-Transfer, providing asset's preventive and corrective maintenance.
  • 21
    Doxel Reviews
    Doxel automates construction progress tracking for owners and general contractors. With Doxel, teams with an objective view of their project today and an accurate prediction of where it will be tomorrow. Teams can easily see problems and use objective data to maintain a shared understanding that drives solutions. Owners and GCs stay ahead of cost overruns and schedule delays. How it works: Doxel compares 360 video of your site with your BIM and schedule using AI and machine learning to create a near real time dashboard of your site's current progress. You get: Work in place tracking- save an average 10 hours per week per superintendent vs. manual tracking A fully documented jobsite Weekly schedule reports- automatically Production rate tracking- compare percent complete to your schedule Budget- Save hours reconciling pay applications with objective data Predictive clash detections- Know when a component installed out-of-tolerance Objective data
  • 22
    Eyrus Reviews

    Eyrus

    Eyrus

    $100 per month
    Eyrus' worksite management platform enhances accuracy and effectiveness in your management processes in real-time, covering everything from safety and access control to daily reporting. It delivers visibility into the job site by ensuring the right personnel are present at the appropriate times, providing crucial insights that reflect the worksite's status throughout construction, facilities maintenance, and daily operations. This platform empowers you to streamline workflows and monitor project efficiency, all within a single interface. You can easily generate automated and detailed reports based on the collected data from worker profiles, including compliance, daily logs, attendance, timesheets, payroll, and more. Additionally, it keeps key stakeholders informed throughout the entire process, fostering transparency and collaboration. Trusted by teams globally across various industries, Eyrus enhances safety, efficiency, and accountability in construction projects. Furthermore, the platform seamlessly integrates with widely-used software to ensure that operations on your worksite are as smooth as possible.
  • 23
    Proarc Reviews
    Proarc's document management software is designed to manage engineering documents. It provides teams with controlled collaboration tools and automated workflows that support document best practices. The system also gives them a central repository for all asset operations and project documents. Proarc's EDMS provides a solution for companies who need to plan, execute, collaborate and track documentation from the moment it arises until the handover and operation of the finished facility. Proarc allows your entire team to deliver on time at each milestone and can be audit-ready at all times. Proarc is highly configurable and can be tailored to meet the specific needs of each project, as well as supporting the overall policies of the organization. Our solutions have been used successfully in the industry for almost 30 years. They are adaptable to meet changing requirements.
  • 24
    TeamSystem Reviews
    Access your projects in real-time to boost efficiency and secure more tenders and projects. This solution is perfect for sharing project details with employees, suppliers, and clients alike. You have the ability to oversee your projects, produce estimates, and monitor both public and private accounting seamlessly in the cloud. TeamSystem Construction Project Management aids your business in the development and submission of construction proposals, which necessitate effective management of lists and prices, accurate cost estimation, and detailed quantity takeoffs. Additionally, it offers 4D capabilities for scheduling and planning, as well as 5D functionalities for project management and cost control. Fully cloud-based, Estimation in Cloud was crafted for those who require collaboration on project management, estimates, price lists, and contracts with a professional team, ensuring multiple access points at any time and from anywhere. With the provided BIM plugin, users can effortlessly and precisely connect estimated measurements to the model, enhancing overall project accuracy. This integration allows for a streamlined workflow, ultimately leading to more successful project outcomes.
  • 25
    Agave Reviews

    Agave

    Agave

    $500 per month
    The Agave API provides a consolidated interface for accessing and managing data from various software solutions that are frequently utilized in the construction and field services sectors. Our integration capabilities encompass a range of applications related to project management, scheduling, finance, document storage, and beyond. By implementing these integrations, companies can enhance their sales potential and improve customer loyalty. Nonetheless, the construction technology landscape is often fragmented and compartmentalized, making the development and upkeep of integrations a challenging task. Integrating with a single system can take several months, and the ongoing monitoring and maintenance of these connections may consume hours each week. Agave streamlines this process by enabling users to interact with multiple systems of record within the construction industry, thereby facilitating sales growth and customer retention. Our unified API allows for seamless data exchange from various source systems, which users authorize your application to access, simplifying the integration experience significantly. This efficiency not only saves time but also helps businesses adapt more quickly to changing technology needs.