Average Ratings 0 Ratings
Average Ratings 0 Ratings
Description
The campaign aims to enhance performance monitoring and material planning through effective tracking of overall material consumption and production across the facility. By utilizing a mass balance approach, the system ensures comprehensive oversight of resource usage. Delays are meticulously tracked and analyzed via the customizable delay structure of QRM, which also manages extensive sample testing alongside yield and quality evaluations. QRM, a tablet-based application designed for Industry 4.0 mobile operators, facilitates live dashboards and generates in-depth production and performance analysis reports. Users receive real-time alerts regarding any process complications and can identify recurring patterns impacting operations. Furthermore, operational events—including delays, equipment utilization, and production metrics—are automatically monitored for efficiency. A typical recycling plant features a network of interconnected operations that may function simultaneously or sequentially, contingent on the specific configuration and quality requirements of the facility, ultimately contributing to streamlined processes and improved outcomes.
Description
Logistics and planning serve as the vital lifeblood of a factory, enabling the creation of top-tier products. The availability of intuitive planning tools, along with real-time reports and analyses, significantly enhances the department's operational efficiency. However, delays in the delivery of materials and semi-finished goods to production cells pose the most significant challenge in the interplay between logistics and production, contributing to a subpar production-to-plan ratio. Another critical issue lies in the communication breakdowns between consumers in the production department and suppliers from the in-house logistics team. In an ever-evolving manufacturing environment, the absence of swift access to comprehensive analyses presents a substantial hurdle. This information deficit leads to a paralysis of action, perpetuating a state of unawareness in a troubling situation, which ultimately hampers overall productivity and responsiveness.
API Access
Has API
API Access
Has API
Integrations
No details available.
Integrations
No details available.
Pricing Details
No price information available.
Free Trial
Free Version
Pricing Details
$69 per month
Free Trial
Free Version
Deployment
Web-Based
On-Premises
iPhone App
iPad App
Android App
Windows
Mac
Linux
Chromebook
Deployment
Web-Based
On-Premises
iPhone App
iPad App
Android App
Windows
Mac
Linux
Chromebook
Customer Support
Business Hours
Live Rep (24/7)
Online Support
Customer Support
Business Hours
Live Rep (24/7)
Online Support
Types of Training
Training Docs
Webinars
Live Training (Online)
In Person
Types of Training
Training Docs
Webinars
Live Training (Online)
In Person
Vendor Details
Company Name
Quad Infotech
Website
www.energymethods.com
Vendor Details
Company Name
Ruby Logic
Country
Poland
Website
rubylogic.eu/en/factory/logistics
Product Features
Energy Management
Benchmarking
Bill Audit
Bill Database
Bill Importing
Budgeting & Forecasting
Compliance Management
Contract Management
Cost / Use Reporting
Emissions Monitoring
Energy Price Analysis
Facility Scheduling
Greenhouse Gas Tracking
Load Control
Load Forecasting
Meter Tracking
Risk Management
Weather Normalization
Product Features
Production Scheduling
"What If" Scenarios
Automated Scheduling
Bottleneck Optimization
Capacity Planning
Constraint Scheduling
Job Scheduling
Material Planning
Priority-Based Scheduling
Quality Control