ScheduleLens transforms construction schedules into detailed forensic analysis reports without the need for desktop applications, extensive training, or waiting for consultancy services. You can simply upload a file from Primavera P6 (.xer / .xml), Microsoft Project (.mpp / .xml), or Asta Powerproject (.pp), and ScheduleLens conducts a comprehensive DCMA 14-Point health check, as well as critical-path and float analysis, along with logic and constraint audits; it also offers forensic delay analysis for two schedules and generates an AI-powered executive summary. Once the analysis is complete, reports are available for download in PDF format, accompanied by an Excel appendix for further review. All uploaded files are promptly deleted after processing and are never utilized for AI model training, ensuring confidentiality and security. Developed by a project director with experience on the owner’s side, the service is affordably priced from $29 per report, with monthly subscription options starting at $79. In addition to these features, ScheduleLens provides a user-friendly interface that allows for quick and efficient analysis without compromising on quality or detail.