Average Ratings 2 Ratings
Average Ratings 0 Ratings
Description
The Eyelit Technologies solution suite, Eyelit SIOP, Eyelit APS, Eyelit MES, and Agent EyeQ, are delivered on a single data platform. Eyelit APS is advanced planning and scheduling software that runs on the same data model as Eyelit MES, so real-time WIP, downtime, and shop-floor changes feed updated schedules back to execution.
Eyelit APS performs multi-zone production sequencing — for example Body, Paint, and Trim — optimized holistically in a single run, and models re-entrant flows, merges, splits, buffers, and differing line speeds across zones. Eyelit APS replans with memory: when demand or supply changes, it minimizes disruption to the existing schedule, with the degree of allowed change configurable at any level or attribute.
Eyelit APS provides a wide range of constraint types to model any company's business rules, including feature-combination limits, dynamic spacing, run-lengths on sub-sequences, sequence-dependent setup times, and inventory simulation during sequencing. Eyelit APS delivers Available-to-Promise and Capable-to-Promise in both batch and real-time modes, with the real-time module connecting to the order management system.
Description
Built for metal service centers, LineSight AI plans slitting and production. Planners get slitting plans built from the open orders and coil inventory already in their ERP, designed to turn more of every coil into sellable product and less into scrap. Plans respect grade, gauge, width, ID/OD, PIW, edge trim, knife setups, multi-pass jobs and must-ship dates, and the planner reviews, adjusts and releases each one.
Beyond planning, it handles order intake: purchase orders arriving by email, PDF or photo become sales orders, work orders are created and freight is booked. Nothing is written to the ERP until a person approves it.
Live with PS Data, Invera INVEX and Enmark Eniteo; can connect to virtually any ERP. Implementation takes under a month.
Elite Steel saw its scrap rate fall 2.9 points, gross margin rise 20% and annualized revenue grow by $850K.
The first 3 months are free; after that, pricing is value-based and tied to documented savings.
API Access
Has API
Yes
API Access
Has API
No
Integrations
WhatsApp
No
Pricing Details
Contact us for additional details.
Free Trial
No
Free Version
No
Pricing Details
First 3 months free. After that, the company says it charges a fraction of the savings LineSight generates. The specific fraction, billing interval, minimums, and any additional fees are not stated.
Free Trial
Yes
Free Version
No
Deployment
Web-Based
Yes
On-Premises
No
iPhone App
No
iPad App
No
Android App
No
Windows
Yes
Mac
Yes
Linux
Yes
Chromebook
Yes
Deployment
Web-Based
Yes
On-Premises
No
iPhone App
No
iPad App
No
Android App
No
Windows
No
Mac
No
Linux
No
Chromebook
No
Customer Support
Business Hours
Yes
Live Rep (24/7)
Yes
Online Support
Yes
Customer Support
Business Hours
No
Live Rep (24/7)
No
Online Support
No
Types of Training
Training Docs
Yes
Webinars
Yes
Live Training (Online)
Yes
In Person
Yes
Types of Training
Training Docs
No
Webinars
No
Live Training (Online)
No
In Person
No
Vendor Details
Company Name
Eyelit Technologies
Founded
1997
Country
United States
Website
eyelit.com/advanced-planning-and-scheduling/
Vendor Details
Company Name
LineSight Technologies, Inc.
Founded
2025
Country
Chicago, Illinois, United States
Website
linesight-ai.com
Product Features
APS
Automated Scheduling
Yes
Capacity Planning
Yes
Change Management
Yes
Constraint Management
Yes
Demand Planning
Yes
KPIs
Yes
MRP
Yes
Order Management
Yes
Production Scheduling
Yes
Quality Management
Yes
What-if Analysis
Yes
Production Scheduling
"What If" Scenarios
Yes
Automated Scheduling
Yes
Bottleneck Optimization
Yes
Capacity Planning
Yes
Constraint Scheduling
Yes
Job Scheduling
Yes
Material Planning
Yes
Priority-Based Scheduling
Yes
Quality Control
Yes
Product Features
Production Scheduling
"What If" Scenarios
No
Automated Scheduling
No
Bottleneck Optimization
No
Capacity Planning
No
Constraint Scheduling
No
Job Scheduling
No
Material Planning
No
Priority-Based Scheduling
No
Quality Control
No