Forgot your password?
typodupeerror
Power

+ - Volcano power plan gets U.S. go-ahead-> 2

Submitted by cylonlover
cylonlover (1921924) writes "Having successfully negotiated the challenging regulatory slopes of the U.S. Bureau of Land Management, the U.S. Forest Service, the U.S. Department of Energy, and a host of Oregon state agencies, the Newberry Enhanced Geothermal Systems (EGS) demonstration project is in the process of creating a new geothermal reservoir in central Oregon. The core of the new reservoir is a two mile (2.7 km) deep well drilled about four miles (5.4 km) from the center of Newberry Volcano. The rock surrounding the wellbore reaches temperatures in the order of 600 F (300 C), and is nearly impermeable to water. That, however, is about to change.

Newberry Volcano is one of the largest and youngest volcanoes in the United States. Having last erupted about 1,300 years ago, it consists of over 400 individual volcanic vents, which, when combined, form a broad mounded landform referred to as a shield volcano. The Newberry EGS Demonstration geothermal reservoir is being formed in the high-temperature, low-permeability deep lava of the volcano's northwest flank."

Link to Original Source
Power

+ - Researchers claim breakthrough with power amplifiers->

Submitted by Dupple
Dupple (1016592) writes "Powering cellular base stations around the world will cost $36 billion this year—chewing through nearly 1 percent of all global electricity production. Much of this is wasted by a grossly inefficient piece of hardware: the power amplifier, a gadget that turns electricity into radio signals.

The versions of amplifiers within smartphones suffer similar problems. If you’ve noticed your phone getting warm and rapidly draining the battery when streaming video or sending large files, blame the power amplifiers. As with the versions in base stations, these chips waste more than 65 percent of their energy—and that’s why you sometimes need to charge your phone twice a day.

It’s currently a lab-bench technology, but if it proves itself in commercialization, which is expected to start in 2013—first targeting LTE base stations—the technology could slash base station energy use by half. Likewise, a chip-scale version of the technology, still in development, could double the battery life of smartphones."

Link to Original Source

Real Programmers don't write in FORTRAN. FORTRAN is for pipe stress freaks and crystallography weenies. FORTRAN is for wimp engineers who wear white socks.

Working...