Comment What if Ireland seized the data? (Score 1) 502
And told the US courts that it must make its request through them.
And told the US courts that it must make its request through them.
In January, SpaceShipTwo blasted off for a powered test and sailed through a follow-up glide flight, but then it went into the shop for rocket refitting. It’s expected to go through a series of glide flights and powered flights that eventually rise beyond the boundary of outer space (50 miles or 100 kilometers in altitude, depending on who’s counting).
Hopefully this test flight indicates that they have installed the new engine and are now beginning flight tests with equipment that will actually get the ship into space.
The Michigan teachers union sics bill collector on former members after they legally opted out of the union:
http://poorrichardsnews.com/po...
This is just more SLS type pork.
NASA isn’t meeting its own requirements for matching cost and schedule resources with the congressional requirement to launch the first SLS in December 2017. NASA usually uses a calculation it calls the “joint cost and schedule confidence level” to decide the odds a program will come in on time and on budget. “NASA policy usually requires a 70 percent confidence level for a program to proceed with final design and fabrication,” the GAO report says, and the SLS is not at that level. The report adds that government programs that can’t match requirements to resources “are at increased risk of cost and schedule growth.”
In other words, the GAO says SLS is at risk of costing more than the current estimate of $12 billion to reach the first launch or taking longer to get there. Similar cost and schedule problems – although of a larger magnitude – led President Obama to cancel SLS’s predecessor rocket system called Constellation shortly after taking office.
The current $12 billion estimate for the program’s cost to achieve one unmanned launch. That is four times what it is costing NASA to get SpaceX, Boeing, and Sierra Nevada to build their three spaceships, all scheduled for first manned launch before 2017. SLS not only can’t get off the ground before 2017, it can’t even get built for $12 billion!
If this isn’t the definition of a wasteful, boondoggle designed merely as pork, then what is? There is no way SLS is going to ever get the USA back into space. It should be shut down, now.
Lockheed Martin is not the free market when it comes to government. They are closer to a lamprey.
Analysts believe that a direct hit could cause widespread power blackouts, disabling everything that plugs into a wall socket. Most people wouldn’t even be able to flush their toilet because urban water supplies largely rely on electric pumps. . .
.
According to a study by the National Academy of Sciences, the total economic impact could exceed $2 trillion or 20 times greater than the costs of a Hurricane Katrina. Multi-ton transformers damaged by such a storm might take years to repair.
CWG’s Steve Tracton put it this way in his frightening overview of the risks of a severe solar storm: “The consequences could be devastating for commerce, transportation, agriculture and food stocks, fuel and water supplies, human health and medical facilities, national security, and daily life in general.”
No man is an island if he's on at least one mailing list.